Training Program

Each Training Period last for 26 weeks which is consist of two parts.

First : Theory training last for 10 weeks.

Second : Simulation System Operation training last for 16 weeks


To maximize the training efficiency, the trainees:

  • All the trainees recommend with bachelor’s degree (or higher) of thermodynamic speciality or electric power speciality, and have some power plant operation experience.
  • The trainees of each speciality should be familiar with the systems of his speciality, be able to draw the system diagrams and indicate the important devices of this system.
  • The trainees of each speciality should be familiar with the actual positon of the important devices in the power plant.
  • The trainees of each speciality should be familiar with the English abbreviations on the DCS interface.
  • The trainees of each speciality should be familiar with the volume or the containers and their level range.
  • The trainees of each speciality should be familiar with the motors rated current (LV-MV operation range).
  • All the trainees should be with the ability of English listening, reading, speaking and writing, so they can communicate with the trainers fluently.


  • LIST TRAINING PROGRAM PACKAGE

    Pelatihan peraturan K2 (Keselamatan Ketenagalistrikan)

    Pelatihan Teori dan Praktek Peralatan bantu BOP PLTU

    • Sistem Water Treatment
    • Sistem Coal Handling
    • Ash and Slag Handling
    • Flue gas desulphurization

    Pelatihan Teori dan Praktek Sistem Turbin PLTU batubara

    Pelatihan Teori dan Praktek Sistem Boiler PLTU batubara

    Pelatihan Teori dan praktek Sistem Kelistrikan PLTU batubara

    Pelatihan Unit PLTU

    • Simulator PLTU 125 MW – PC (Pulverized Coal) Ultra High Pressure Boiler
    • Simulator PLTU 135 MW – PC Ultra High Pressure Boiler
    • Simulator PLTU 150 MW – CFB (Circulating Fluidized Bed) Ultra High Pressure Boiler
    • Simulator PLTU 300 MW – PC Subcritical Pressure Boiler
    • Simulator PLTU 660 MW – PC Supercritical Pressure Boiler
    • Simulator PLTU 1000 MW – PC Ultra Supercritical Pressure Boiler

    Pelatihan Mengoperasikan unit PLTU batubara

    • Proses cold start up unit, hot start up
    • Proses shutdown metode sliding parameter dan hot banking
    • Kondisi mengalami gangguan/ malfunction handling

  • PLTS – Pembangkit Listrik Tenaga Surya
  • PLTA – Pembangkit Listrik Tenaga Air